LDA City Phase 1 is a flagship residential scheme launched by the Lahore Development Authority (LDA) as a legal, government-backed development. Spanning approximately 5,871 kanals, it offers a range of plot sizes from 5 Marla to 2 Kanal with modern infrastructure such as underground electrification and wide internal roads. Its strategic location on Ferozepur Road provides excellent connectivity to Lahore Ring Road and major city amenities.
Map-calculated
In total
In total
LDA City Phase 1, also known as the Jinnah Sector, is now in full on-ground development with all main roads paved, a complete sewerage network installed, and electricity rollout underway across the site. The 200-ft Chenab Road provides direct access to the Lahore Ring Road Southern Loop and links to the M-2, Multan, and Ferozepur roads. Possession has officially begun, with approximately 4,000 plots across six blocks handed over in September 2025; further handovers are expected within three months for Blocks G and H. Road-leveling work is ongoing in Block BB of the Iqbal Sector.
The Lahore Medical City, a dedicated 4,000-kanal healthcare zone, is under construction within LDA City Phase 1’s broader footprint. Concurrently, underground utilities, including electrification and a dedicated grid station, are being rolled out across possession-ready blocks. A 200 KVA transformer has been successfully installed, enhancing power reliability and supporting residential and commercial growth.
As of early 2026, market prices for Phase 1 plots reflect strong demand and infrastructure readiness: 5 Marla plots range from PKR 30 million to 55 million; 10 Marla from PKR 50 million to 85 million; 1 Kanal from PKR 90 million to 1.2 billion; and premium 2 Kanal units reach ~PKR 4 billion. Development charges remain fixed at PKR 400,000 (5 Marla), PKR 690,000 (10 Marla), and PKR 1.15 million (1 Kanal). Updated file rates place 1 Kanal plots at PKR 1.08–1.10 crore.
Phase 1 benefits from unparalleled road infrastructure, anchored by the 300-ft Indus and Jhelum Roads, the 200-ft Chenab Road, and multiple dedicated Lahore Ring Road interchanges. This connectivity—linking directly to Ferozepur Road, Defense Road, Pine Avenue, and the M-2 Motorway—positions LDA City Phase 1 as a central logistics and residential hub, significantly boosting land value and long-term ROI.
House Price
YoY N/A
Plot Price
YoY +46.43%
Commercial Price
YoY N/A
Prime location with excellent connectivity to major interchanges, Ring Road, Ferozepur Road, and key entrances; near Metrobus station and airport.
Partnership with reputable developers under LDA supervision, aiming to ensure quality standards and project success.
Long-term investment with potential for significant value appreciation once infrastructure is completed; expected high returns in the future.
Planned with wide road corridors (300ft Jehlum, Indus, 200ft Chanab), underground electricity, extensive green spaces, parks, schools, healthcare facilities, and commercial zones.
Low entry prices for 5-marla and 10-marla plots, making home ownership affordable for middle-class and upper-class buyers.
History of delayed LDA projects like Johar Town, raising doubts about timely completion and reliability.
Perceived mismanagement and possible corruption; concerns that the project is a money-minting scheme rather than a public benefit initiative.
Delayed balloting process, contributing to uncertainty and extended waiting periods for plot allotment.
Long waiting periods of 5 to 15 years before the area becomes livable; project completion may take over a decade, with estimates up to 20 years.
Construction has barely started; possession of Phase 1 and adjacent LDA Avenue 1 remains pending; slow on-ground development.
Massive project scale raises doubts about LDA's ability to execute it successfully, given past failures and complexity.